MRO Spare Parts Reduce Long Lead Times for Integrated Supplier

Ice cream manufacturer benefits from spare Delrin® filler tubes

spare parts ice cream manufacturingAn integrated supply company was responsible for providing spare parts in an ice cream manufacturing plant. The Delrin® ice cream cone filler tubes used in the plant were a consumable item that had to be periodically replaced. The tubes were manufactured in Europe and long lead times from the machinery manufacturer were causing down time in the plant.

Spare parts reduce lead times and lower costs

Curbell Plastics sales team worked with the site manager at the integrator to manufacture comparable tubes with short lead times. One additional benefit was that the filler tubes manufactured by Curbell were significantly less expensive than the tubes from the machinery manufacturer. This allowed the integrator to show a documented cost savings for the ice cream manufacturer.

NEED PLASTIC FABRICATION OR MACHINING SERVICES? WE CAN HELP.

We provide customers with machined parts, fabrication solutions, and cut-to-size materials for any application.

Working with Specialized Industries Since 1942

Not sure which materials best fit your needs?

Our experienced sales and technical teams are available to assist you with material selection challenges.

stacked sheets, rods, and tubes of acetal in various colors

Research Materials

We carry an extensive inventory of plastic sheets, rods, tubes, film, tapes, adhesives and more from highly qualified manufacturers.

Engineer technician designing drawings of mechanical parts

Specialized Services

We provide value for our customers with inventory programs, troubleshooting, traceability, process efficiencies, and more.

Acrylic sheet carving machine with a Flatbed cnc machine

Fabrication & Machined Parts

Curbell supplies fabricated and machined plastic parts manufactured via CNC routing, milling, vacuum forming, die cutting, and more.

Smiling woman
Have a Question?
PRODUCT DISCLAIMER
Curbell Plastics, Inc. Unauthorized use is strictly prohibited. All other trademarks, service marks and logos used herein are property of their respective owners. All rights hereto are retained by Curbell Plastics and any third party owners of such rights. All statements, technical information and recommendations contained in this publication are for informational purposes only. Curbell Plastics, Inc. does not guarantee the accuracy or completeness of any information contained herein and it is the customer's responsibility to conduct its own research and make its own determination regarding the suitability of specific products for any given application.

©2024 Curbell Plastics, Inc. All rights reserved.

California Transparency in Supply Chains Act | Terms & Conditions | Privacy Policy